Bridge reconstruction of 2 structure, rehabilitation of 5 structures and road rehabilitation.
ID - 82052-123096
ID - 82052-123096
Location: MI Wayne County County 07032 District
Bid Date/Time: Dec. 1, 2023, 3:30 p.m.
Project Type:
Status: Awarded
Description:
Bridge reconstruction of 2 structure, rehabilitation of 5 structures and road rehabilitation. 2.50 mi of road rehabilitation including concrete pavement repair, joint resealing, hot mix asphalt resurfacing and pavement markings and reconstruction of 2 structures including a culvert replacement and a bridge replacement including 35-inch steel plate girders and rehabilitation of 5 structures including partial deck replacements, epoxy overlays, concrete deck, barrier and substructure patching, replacement of expansion joints, replacement of barrier, guardrail and approach work on US-24/I-75 Connector from US-24 to I-75 and I-75 over Frank and Poet Drain, Conrail and Racho Road in the city of Taylor, Wayne County. This Project includes a 5 year epoxy performance warranty and a 2 year concrete surface coating warranty. ** 17569 Fa **In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of Ea. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder.
Bridge reconstruction of 2 structure, rehabilitation of 5 structures and road rehabilitation. 2.50 mi of road rehabilitation including concrete pavement repair, joint resealing, hot mix asphalt resurfacing and pavement markings and reconstruction of 2 structures including a culvert replacement and a bridge replacement including 35-inch steel plate girders and rehabilitation of 5 structures including partial deck replacements, epoxy overlays, concrete deck, barrier and substructure patching, replacement of expansion joints, replacement of barrier, guardrail and approach work on US-24/I-75 Connector from US-24 to I-75 and I-75 over Frank and Poet Drain, Conrail and Racho Road in the city of Taylor, Wayne County. This Project includes a 5 year epoxy performance warranty and a 2 year concrete surface coating warranty. ** 17569 Fa **In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of Ea. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder.
Project Roles
Bidders
- Bidder C A HULL CO INC, - $19,722,426, 8177 GOLDIE STREET WALLED LAKE MI 48390
- Bidder TOEBE CONSTRUCTION LLC, - $18,519,936, WIXOM MI 48393
- Bidder Z CONTRACTORS INC, - $19,387,359, 50500 DESIGN LANE UTICA MI 48315
Apparent Low Bidder: TOEBE CONSTRUCTION LLC