Texas Contractor

Dedicated to the people who make our built environment better and safer. We tell your stories and celebrate your successes.

Register with us and receive industry news and content only available to subscribers.

Subscribe
Contacts

Indianapolis, IN, USA (HQ)

903 E. Ohio St., Indianapolis, IN 46202

Call: (317) 423-2325

info@acppubs.com

VLK Architects and PBTISD Break Ground on Eagle Stadium at Rotary Field

Pecos High School Stadium rendering
Pecos High School Stadium rendering
From left to right: Athletic Trainer, Joel "Doc" Birch; Band Director, Richard Cole; Superintendent, Brent Jaco; Athletic Director/Head Football Coach, Scott Williams; and Football Coach, Armando Martinez
From left to right: Athletic Trainer, Joel "Doc" Birch; Band Director, Richard Cole; Superintendent, Brent Jaco; Athletic Director/Head Football Coach, Scott Williams; and Football Coach, Armando Martinez
From left to right: School Board Trustee, Alex Andrea Zamarripa; School Board Trustee, Becky Gonzales; School Board President, Criselda Carrasco; Superintendent, Brent Jaco; and School Board Trustee Cookie Canon
From left to right: School Board Trustee, Alex Andrea Zamarripa; School Board Trustee, Becky Gonzales; School Board President, Criselda Carrasco; Superintendent, Brent Jaco; and School Board Trustee Cookie Canon
PECOS, TX — VLK Architects joins Pecos-Barstow-Toyah ISD (PBTISD) to celebrate the official groundbreaking for the construction of Eagle Stadium at Rotary Field. Student athletes, athletics coaches, campus administrators, and the PBTISD Board of Trustees were all in attendance to commemorate this project for the district and the community. The groundbreaking took place next to the construction site.

Eagle Stadium at Rotary Field will be the home to the Pecos High School Eagles and serve as a premier event stadium. Once complete, this stadium will be able to host football and soccer games, track and field events, band competitions, and more.

“We are excited to bring a new, dynamic stadium to PBTISD that will be the envy of other districts across West Texas,” said Brent Jaco, Superintendent of PBTISD. “Though the former structure is gone, the land remains. ... This land has been the site of athletic events for over 90 years in the community. So, the memories will always remain for everyone that comes through PBTISD.”

The project includes a new pressbox, home and visitor seating, concession stands, and restrooms. Along with the stadium’s reconstruction, there will be new turf, a resurfaced track, and new lighting.

“VLK Architects is excited to be a part of this project that will impact so many people in the PBTISD community,” said Monika Castillo, AIA, Principal of VLK Architects. “This is the second construction project across the district, and it has been an honor to continue our relationship with PBTISD.”

The project is scheduled to be complete by August 2022.
Hyundai Construction Equipment
Your local Hyundai Construction Equipment USA dealer
Nueces Power Equipment